Prepare a better discussion

Buyer and project preparation resources.

Use the checklists to prepare a distributor discussion, commercial-water selection or industrial wastewater review without sending data to a server.

Practical checklists

Start with the minimum useful information.

Each guide is designed to reduce wrong model recommendations and unnecessary quotation rounds.

Channel development

Distributor meeting checklist

For importers, distributors, hospitality-equipment suppliers and local service partners.

  • Target customer segments
  • Product category and quantity
  • Installation and after-sales capability
  • Market documentation requirements
Open checklist →
Application selection

Commercial project checklist

For hotels, restaurants, cafés, offices, schools, factories and drinking-water projects.

  • Daily and peak-hour demand
  • Feed-water TDS and pressure
  • Temperature and dispensing requirement
  • Site and electrical conditions
Open checklist →
Engineering review

Industrial project checklist

For wastewater-producing factories, project owners, industrial parks and qualified EPC partners.

  • Wastewater source and flow
  • Available laboratory analysis
  • Existing treatment process
  • Discharge, reuse or concentrate target
Open checklist →

Transparent commercial boundary

Standard products first; customization only when requested.

Published models are reference configurations. Final component brands, certifications, packaging, voltage, quantity, price and lead time are confirmed against the specific market and order scope.

No automatic submission: prepare your message here, then review and send it through WhatsApp or email.

SELECTION GUIDE

How to plan commercial RO capacity.

Daily volume, production hours, peak use and storage, with a worked example.

Read the guide ↗

MODEL COMPARISON

300 L/h or 500 L/h?

Compare nominal production, cabinet size and net weight using the July 2026 model records.

Compare JFPS-300L vs JFPS-500L →

Product data sources & configuration notes